Click to return to the MERO-SCHMIDLIN (UK) PLC homepage

home  about  news _

downloads  contact 

MERO UK
_ Construction Systems

_ Curtainwalling

_ Raised Access Floors

MERO-SCHMIDLIN (UK) PLC completes main curtain wall installation
at The Willis Building, 51 Lime Street, London
(29/3/2007)


-

Final Panels being lifted into position on the Willis Building, 51 Lime Street, London- At 9.30pm on Wednesday 28th March 2007, MERO-SCHMIDLIN (UK) PLC  completed the main curtain wall installation on Foster and Partners skyscraper 'The Willis Building', at 51 Lime Street in the City of London. Two vertical strips remain to be installed at later dates (West elevation end of April 2007, East elevation May 2007) following the removal of the two external access hoists to the building by construction manager Mace, which are required for the fit out of the building.

MERO-SCHMIDLIN (UK) PLC's first unitised curtain walling project since partnering with Swiss sister company SCHMIDLIN-TSK in April 2006, has successfully reached this significant milestone early, with three weeks of the installation programme still in hand.

Located adjacent to the Lloyds Building in the City of London, The Willis Building's curtain walling has been designed and manufacturered by the same team as the nearby Swiss Re (30 St. Mary's Axe), National Westminster Tower and Commercial Union Buildings, and is a stunning addition to London's evolving skyline.

[The Willis Building Construction Details...]

_ MERO-SCHMIDLIN (UK) PLC 2006-2010

links    privacy    terms 

_