Click to return to the MERO-SCHMIDLIN (UK) PLC homepage

home  about  news _

downloads  contact 

.
_ Construction Systems
_ _ Roofs
_ _ Building Envelopes
_ _ Facades / Curtain Wall
_ _ Canopies
_ _ Towers
_ _ Atria
_ _ Other

_ Curtainwalling

_ Raised Access Floors

_


Farnborough Airport Terminal Building viewed from airside

MERO rendered visualisation of the Terminal Building

The Airside entrance to the Terminal Building

View on first and second floor horizontal glazing

Interior view showing the horizontal MERO glazing

View on the end of the terminal building
MERO

Farnborough Airport Terminal Building, UK


"MERO-SCHMIDLIN are on our tender list and get the opportunity to quote for any project we feel that requires their specialist bespoke facade services. As architects it is always reassuring to know there are companies such as MSUK who have the technical ability to assist architects like 3D Reid so that our design vision can be realised without compromise."
Paul Green, Divisional Director, 3D Reid Architects

Completed in 2005, the new Terminal Building for TAG Farnborough Ltd. at Farnborough Airport in Hampshire, marked the completion of the first stage of TAG’s plan to turn the former MOD airbase into a world class business airport.

Having already completed the shingle cladding to the new air control tower in 2003, MERO won the contract in late 2003 to design develop the shingle cladding to the new terminal building, and then in mid 2004 to manufacture and install the cladding to the building.

Through the initial design development process, half a dozen alternative cladding solutions were investigated and offered to the client, who eventually settled on the diamond shingle cladding which closely resembled the appearance of the air traffic control tower. The shingle system was designed so that it fixed directly back to the horizontal purlins that spanned between the primary steelwork hoops spaced at 9m centres along the length of the building. Although not in MERO’s supply, MERO was requested to provide full setting out drawings for the positions of the purlins on the building, to ensure their position and the subsequent line of the cladding was exactly where required.

Using a modified version of the rainscreen system used on the air traffic control tower, and incorporating a full vapour barrier, insulation and waterproof membrane build up, almost 25,000 mill finished diamond shaped aluminium shingles were installed to the facades, each interlocking with it’s adjoining shingles to provide the building’s unique skin. The overlapping of the shingles gives the interesting textured finish to the building when close up, yet a smooth uniform effect when viewed at a distance. The flexibility of the cladding enabled the continually changing contours of the building to be easily followed using standard shingles without the need for lengthy and expensive individual shingle design, fabrication or forming.

MERO developed a shuffle glazing system for the 182 panels of glass that form the two levels of windows that run along the length of the building. Totally frameless, the glass panes are supported on just their top and bottom edges, hidden within the head and sill cladding, with vertical silicone joints between panes. With each pane varying in angle between 0 and 47 from vertical dependant on the surrounding building geometry, each panel was designed to be replaced from the outside of the building without the need to demount any of the surrounding finishes. By using the same glazing system on the plant and dummy louvers adjacent to the glass, the system allows for any future reconfiguration of the building. MERO carried out full laboratory testing of the glazing system to ensure it’s suitability.

The huge overhanging ends of the building above the first floor terraces were clad using mill finished aluminium panels to match the feature panels on the ends of the buildings, and to provide a harmonious contrast to the shingle cladding to the rest of the building envelope. Mill finished aluminium panels also featured to the recesses of the ribbon windows as the transition between glass and shingle

Download a 4pp PDF Case Study

_ _
Project Title:
_
Farnborough Airport Terminal Building
Specialist Cladding Package
_
_ Scope of Works: Mill Finish insulated 'Falzonal' Aluminium shingle cladding to the building envelope of the terminal building, first and second floor ribbon window frameless glazing, mill finish aluminium panel cladding to open ends of building and window recesses.
_
_ Cladding Details:

2200m mill finish 'Falzonal' aluminium diamond shingles approx 0.3m x 0.3m on insulated waterproof sub layer build up.
1150m mill finish 3mm thick aluminium panels to open ends of building, window recesses and airside entrance.
370m frameless double glazed ribbon window glazing comprising of either 10.8mm lamianted external pane, 12mm airspace, 6mm clear toughened and heat soak tested internal pane with low-e coating, or 14.8mm laminated external pane, 12mm airspace, 12.8mm laminated internal pane with low-e coating.
_

_ Steelwork Details: 570m lightweight secondary steel framing to open ends of building to support internal soffit lining aluminium panels.
_
_ Year of Completion: 2005
_
_ Contract Duration: 26 months including design development contract
_
_ Client & Main Contractor: TAG Farnborough Airports Ltd.
_
M_ERO UK Architect: Reid Architecture, London
_
.